单选题A prospective client needs to combine Ethernet, FCOE, and iSCSI. They have not been able to practically combine these in the past. Which of the following IBM products meets this need?()A BladeCenter Open Fabric Manager (BOFM) B SAN Volume Controller (...
Friday, April 19, 2024
单选题A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following ...
Tuesday, February 20, 2024
单选题In which phase should a TDA be performed?()A Server deployment B Installation and server configuration C Problem determination/resolution D Needs analysis and design...
Sunday, April 28, 2024
单选题A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which...
单选题A customer is concerned about rising power costs, and the limited space they have left in the computer room. They have been doing some research into virtualization and would like to know if they should pursue this solution.Which of the following archit...
Thursday, October 12, 2023
单选题An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is requi...
单选题A client is experiencing bottlenecks in their IT environment.Which of the following responses address this issue?()A Meet with Operations Manager B Perform Scorpion study C Meet with CFO D Perform CDAT study...
Monday, December 4, 2023
单选题When selling against competition, which of the following focus on the iDataPlex value proposition? ()A Superior chip density B Balance performance, cost, and power+cooling efficiency C Flexible configurations ready for integration and testing at the cu...
Thursday, January 4, 2024
单选题A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports an HS22 blade server can support if the blade does not have an...
单选题A customer plans to deploy Open Fabric Manager (OFM). Which vendors would you recommend?()A Brocade B Blade Network Technology (BNT) C Cisco D Juniper...
单选题A banking customer has two Ethernet Switch Modules installed in an IBM BCE chassis. The modules were configured identically. The Ethernet module in bay 1 was accidentally reset to factory defaults. Which solution returns the module to the customer-spec...
单选题A customer has downloaded new firmware files for the IBM support Web Site. Which of the following is the correct method for updating the firmware for the QLogic Intelligent Passthru Module using the command line?()A Transfer the file to the FC module u...
Friday, March 22, 2024
单选题A healthcare customer is not satisfied with the utilization of their heterogeneous storage devices. Which of the following solutions should the System x technical representative recommend to better provision their storage on demand?()A Tivoli Storage M...
单选题An eX5 client is concerned about the cost-per-GB of the proposed SAS disk-based solution, and suggests using SATA disk technology in order to reduce costs for their 24x7 mission-critical Microsoft SQL Server application. Which of the following addresse...
单选题A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which ...
单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following...
Tuesday, April 16, 2024
单选题A customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life o...
单选题retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere.Which of the following should be discussed w...